Cement Bulker Unloading Compressor
Approx. price from source listing: Rs 1,15,000 / PieceGet Latest Price

Product Overview
Product Details: The Cement Bulker Unloading Compressor is a twin-lobe positive displacement air compressor specially designed for pneumatic unloading of dry bulk cement, fly ash, and other fine powders from bulkers (tankers) to storage silos. It generates a consistent flow of oil-free, pulsation-free, low-pressure high-volume air, ensuring fast, smooth, and dust-free unloading operations at RMC plants, cement terminals, and silo feeding stations. Manufactured with heavy-duty cast iron body, dynamically balanced rotors, and industrial-grade bearings, it offers continuous 24x7 operation, low maintenance, and long service life even in tough working environments. Primer: Red Oxide Anti-Corrosive Top Coat: Machinery Blue (RAL 5012) or as per customer choice Finish: Glossy / Semi-Gloss Optional: PU or Epoxy coating for export / coastal applications
Technical Parameters
| Parameter Description | Specification Rating |
|---|---|
| Material Handled | Food Grain, Cement, Lime Powder, Fly Ash, Gypsum, Plastic Granule |
| Unloading Capacity | 400-1500 m3/hr |
| Blower Power | 26-33 kw |
| System Type | Screw Conveyor |
| Mounting Type | Skid Mounted |
| Application | Bulk Terminal, Cement Plant, Silo Feeding, RMC Plant, Fly Ash Silo |
| Operating Mode | Manual |
| Rated Pressure | 1.5 bar |
| Power Supply | 440V |
| Country of Origin | Made in India |
| Cast Iron | Cast Iron FG 260 / FG 220,Cement Bulker Unloading Compressor |
| Three phase | 415V ±10%, 50Hz, Three Phase AC,Cement Bulker Unloading Compressor |
| Lifting Capacity | 30 Ton |
| Maximum Lifting Height | 30 ft |
| Material | Cast Iron FG210,Cement Bulker Unloading Compressor |
| Type | Portable, Fixed, Rotating |
| Parameter | Specification |
| Type | Twin Lobe Positive Displacement Air Compressor |
| Air Delivery Capacity | 600 – 3000 m³/hr |
| Working Pressure | 0.5 – 1.0 kg/cm² |
| Motor Power | 15 HP – 40 HP |
| Power Supply | 415V ±10%, 50Hz, Three Phase AC |
| Motor Type | TEFC (Totally Enclosed Fan Cooled) |
| Starting Method | DOL / Star-Delta Starter |
| Insulation Class | F, IP55 Protection |
| Lubrication | Oil Splash Type |
| Drive Type | V-Belt / Direct Coupled |
| Duty Cycle | Continuous 24x7 |
| Unloading Rate | 30–40 Tons/hour (depending on setup) |
| Component | Material |
| Casing & Rotors | Cast Iron FG 260 / FG 220 |
| Shafts | EN8 / EN24 Steel |
| Base Frame | Mild Steel (IS 2062) |
| Coupling | Aluminium / Cast Iron Flexible Type |
| Air Filter & Silencer | Mild Steel / Aluminium |
| Safety Relief Valve | Brass / Stainless Steel |
| Gear Housing | Cast Iron / MS Fabricated |
| Bearings | SKF / NBC / FAG Heavy-Duty Bearings |
Standard Application Spheres
Frequently Asked Technical Questions
Q:What is the warranty and expected design lifespan of the Cement Bulker Unloading Compressor?
Shree Ambika Engineering provides a comprehensive 12-month manufacturer warranty. Built with precision CNC-machined alloy steel timing gears and heavy-duty spherical roller bearings, our blowers feature an operating design lifespan exceeding 50,000 hours with standard preventative maintenance.
Q:Is the air delivered by Cement Bulker Unloading Compressor 100% oil-free?
Yes. All SAE positive displacement Roots blowers guarantee 100% oil-free air delivery certified for sensitive processes such as biological wastewater aeration, food powder conveying, and cleanroom air systems. Dual labyrinth seals and atmospheric breather vents physically isolate gear oil from the compression chamber.
Q:Can Cement Bulker Unloading Compressor be exported to Dubai, UAE, Saudi Arabia, and other GCC countries?
Yes, SAE actively exports across the Middle East. We equip units with dual 50Hz/60Hz motors, IP55/IP65 ingress protection, and high-ambient heat dissipation jackets tested for 50°C+ ambient temperatures. Shipments include Certificate of Origin, SASO/Saber compliance, and sea-worthy export crating directly to Jebel Ali and Dammam ports.
Q:What is the standard delivery timeline for Cement Bulker Unloading Compressor?
Standard bare-shaft and skid-mounted configurations are stocked for immediate dispatch (within 24 to 48 hours) from our Vatva GIDC facility in Ahmedabad. Customized assemblies and export orders are dispatched within 7 to 10 working days.



